Stormwater Credit Application
Stormwater Credit Applications
Individual Residential
Credit Application
Education
Credit Application
Stormwater Quantity and Quality Credit Application
Stormwater Application Renewal
Individual Checklist
Please have the following forms completed before you begin the Stormwater Credit Application
-
Additional Information Required If You Have:
- Rain Garden
- Rain garden design
- Read and completed the Rain Garden Manual for Homeowners
- Rain Garden manual for Homeowners worksheet
- Rain Barrel
- Impervious Surface Removal
- Pervious Surface
- Vegetated Filter Strip
- At least 50% of the roof drains into the strip
-
Length required for a slope Slope (%) Length (ft) 0-2 50 2-3 120 3-4 135 4-5 170 >5 210
-
All Forms Require:
- Photograph of each SCM
- Digitized Sketch of property with SCM(s) shown
Education Checklist
The credit is applied from July 1, 2024 — Jun 30, 2025, the deadline date to apply is December 31, 2024.
Please have the following forms completed before you begin the Stormwater Credit Application
-
Lesson Plans if you are not using the NEORSD Curriculum
- Curriculum Daily Lesson Plan Final report due June 15th
- Final Report
Quality And Quantity Checklist
Please have the following forms completed before you begin the Stormwater Credit Application
-
Required Information FOR EACH SCM You Have:
- Peak Flow SCM Credit / Site Runoff Volume Reduction / Stormwater Quality SCM
- Site Stormwater Utility Plan / Drainage area maps - Required
- Inspection and Maintenance Plan or Agreement for each SCM - Required
- Legal Agreement for Operation and Maintenance - Required
-
Stormwater Management Plan, including design calculations
- Required, unless documentation from member community is provided - Documentation from member community ( may include Member Community Review Form - Appendix D)
- Industrial / Marina / No Exposure NPDES Permit
- Proof of Ohio EPA NPDES Industrial Stormwater Permit Coverage ( General or Individual Permit ) - Required
- Applicable Stormwater Pollution Prevention Plan - Required
- Conservation Planning