title_left_329_82a5c0.gif SHARE | 
SEARCH

Pick Up Poop! Dogs can't flush.
PUP reminds you to Pick Up Poop!


Wally Warehouse Wally Warehouse
Wally Waterdrop's educational resources


Opened Bids & Proposals

Contract Name-Bid Type:
Bid - Doan Valley Storage Tunnel (Project No. 1293)(Nancy) NOTE: THE BID OPENING WILL TAKE PLACE AT 1:00 P.M.-Engineering
Contract Description/Overview:
In general, the work shall consist of furnishing all labor, materials, equipment, and incidentals for construction of the following work: approximately 10,025 LF of 18-ft (inside) diameter combined sewer overflow storage tunnel, approximately 9,175 LF of 8.5-ft (inside) diameter conveyance tunnel, seven (7) shafts, two (2) adits and connections between the tunnels and shafts, connections to existing culverts, consolidation sewers, near surface structures, rehabilitation of existing culvert, and modifications to existing regulators. The project will also require coordination with other tunnel projects as part of the Project Clean Lake Program, please refer to the Contract Documents and Specification section 01 11 00, Summary of Work for a more detailed description of project scope.
Bid File Number:
EB-2374
Bid Opening Date:
03/14/2017
Download File:
Submitted Bid Totals (low to high) Before Discount:
SOUTHLAND JOHNSON BROS MOLE JV
MCNALLY/KIEWIT DVT JV
TRAID C & M MCNALLY HEALY JV
 - 
 - 
 - 
$134,997,500.00
$142,320,000.00
$146,553,750.00
 - 
 - 
 - 
()
()
()
Resolution Number:
2-17
 
 
  © 2004 - 2017 NEORSD HOME  |  FAQ  |  CONTACT US  |  SITE MAP  |  CAREERS  |  DIVERSITY  |  EN ESPANOL